Andrew Leavitt is a Senior Director at Ankura, based in Philadelphia. He has broad experience advising clients to drive successful outcomes. He utilizes forensic schedule, loss-of-productivity, technical issue, and forensic cost analyses to offer keen strategic insight and assist clients in avoiding and resolving disputes. Andrew has participated in domestic and international disputes on projects, including hospitals, hotels, manufacturing facilities, bridges, pipelines, high-rises, and industrial plants. He assists clients throughout dispute resolution in mediation, arbitration, and trial. Andrew draws on this experience to advise clients in dispute avoidance, project management, and planning and scheduling.

Experience

Andrew’s professional experience includes:

  • Processing Facility – TN: Performed analysis of subcontractor claims for delays and productivity impacts on a $10 billion security-sensitive government facility for settlement negotiations. Prepared baseline schedule review and explanatory white paper for federal government budgetary review and approval.
  • Convention Center – Seattle, WA: Performed Critical Path Method (CPM) schedule delay analysis and issue review pertaining to structural steel issues for $2 billion urban convention center, in preparation for mediation and for trial in state court. Assisted in the preparation of expert reports and testifying expert and counsel throughout trial.
  • Hotel, Casino, and Spa – Black Hawk, CO: Performed schedule delay analysis and standard of care review for client constructing a new high-rise hotel and renovating an existing casino. Assisted in the defense of multimillion-dollar claims and counterclaims for trial in state court.
  • Mixed-Use Luxury High-Rise – Los Angeles, CA: Provided affirmative and defensive analysis of schedule delay and loss of productivity claims pertaining to electrical and fire alarm issues on an over $1 billion high-end hotel and condo development for mediation and in preparation for trial. Participated in mediation proceedings between the parties.
  • New Hospital Construction – New York, NY: Performed CPM schedule delay analysis and forensic issue analysis pertaining to curtainwall issues on a $1.5 billion cancer care center and prepared for litigation support for trial in state court.
  • International Bridge – Windsor, ON: Provided advisory support and schedule delay analysis for client constructing high-profile $5.7 billion bridge project. Collaborated with counsel and client to improve project controls processes and advised on the calculation of potential damages and delay.
  • Power Plant – Salem, MA: Assisted in the development of support for nearly 15 claims, ranging from unpaid change orders to loss of productivity, resulting in over $45 million in damages. Assisted in the production of an expert report for AAA arbitration.
  • Mixed-Use Hotel and Residential High-Rise – New York, NY: Assisted in development of delay analysis for claims mitigation work for a high-end project in Manhattan. Prepared delay analysis for expert report for trial in state court.
  • Curtainwall Subcontractor – Chester County, PA: Provided advisory review of schedule and program management processes. Development of program management and schedule management support plan, best practices, and training.
  • Domestic Process Plant – Rock Springs, WY: Provided schedule analysis and litigation support for a process plant in the American Arbitration Association (AAA) arbitration.
  • Natural Gas Pipelines – Wheeling, WV: Assisted in resolution of disputes on multiple $100 million pipeline projects for a contractor experiencing revisions to technical specifications, changed conditions, schedule compression, and productivity impacts.
  • Natural Gas Pipeline – Chester County, PA: Performed schedule delay and productivity analyses for an over 15-mile pipeline extension project. Prepared expert response report to contractor total cost and delay claims for use in arbitration.
  • New Embassy Compound – London, UK: Assisted in delay and issue analysis on a $1 billion new U.S. embassy compound in Europe.
  • Mixed-Use Mid-Rise Development – Seattle, WA: Performed CPM schedule delay analysis and prepared memorandum of analysis for insurance recovery claim on multimillion-dollar new construction development.
  • Mixed-Use High-Rise Construction – Philadelphia, PA: Evaluated reimbursable contract costs on a $1.5 billion urban high-rise, mixed-use commercial property development project.
  • University Laboratory – Newark, DE: Performed schedule delay analysis, manpower review, and productivity analysis for contractor constructing multimillion-dollar laboratory building in preparation for claims.

Publications and Presentations

  • CDR-4105: Assessing the Reasonableness and Reliability of CPM Schedules for Use in Forensic Schedule Analyses (AACEi)
  • Project Scheduling 101, University of California Project Management Bootcamp
  • Forensic Schedule Analysis: Effectively Establishing Causation Through Supplementary Analyses (WPL)
Education
  • Graduate Certificate, Engineering Management, Temple University
  • BS, Mechanical Engineering, Drexel University
Certifications
  • Professional Engineer, Pennsylvania
Affiliations
  • Association for the Advancement of Cost Engineering, International (AACEi)
  • Society of Construction Law – North America (SCL-NA)